Our scope of services
With a turnaround time of 4 months, our #SGS team replaced individual sections of the 96 m long rotary kiln. SGS Industrial Services GmbH was responsible for the mechanical erection of:
- the kiln inlet including a new roller station
- the infeed chamber
- the steel construction inspections
Successful handling of heavy loads
The weight of the individual parts was particularly challenging. The heaviest lift, with a total weight of 247 tons, comprised the pre-assembled kiln section with race. Within a span of three hours and utilizing an 600 tons crawler crane, the #SGSteam successfully carried out the large lift. Due to various interfering edges, the kiln was only able to be turned sideways. These challenges were overcome smoothly and professionally thank to the excellent collaboration within the #SGSteam, as well as with customers and partners.
Project data
- Commissioner
- IKN GmbH
- Customer
- SCHWENK Zement GmbH & Co. KG
- Industry
- Stone/Earth/Cement
- Construction location
- Allmendingen, Germany
- Contruction period
- 5 1/2 months
- Contributors
- 30
- Specialties
- The weight of the individual parts presented a particular challenge. The heaviest lift had a total weight of 247 tons. The limited time also required careful planning and coordination.
- Scope of delivery & service